We're doing it at my club,which was built in 1924 on spongy, clay spoil. The back 9 is finished. The front is in process.
A firm came in, digging deep drains every 8 yards, or so, and we have noted significant improvements. No, it;s not perfect, but we're playing, and balls are not plugging.
Last year, after this much rain, the club would have been closed.
Cost us about $5k per member. Well worth it.