The eigth green is actually three tiers, four if you count the fairway entry, that are all elevated a foot. You can see the green profile if you look at Ross' sketch, Section A-A. The missing buildings are the old cart barns that have been moved to a different location. That area is to the left of #10 tees which are barely visible in the after photograph. Hopefully, nothing will be put back in that space.
This construction work was performed over a 10 month period by a crew of one shaper and three laborers under the supervision of Scot Drader, who also helped with some excavator and dozer operation. The superintendent and three or four of his guys helped throughout, while still maintaining certain aspects of the golf course. Even the Director of Golf and the club president and vice president contributed a major amount of manual labor. Total cost for this project, including new cart barn, new maintenance building, and fairly substantial irrigation work- less than $2 million. It was an impressive effort with great results.