The Tifgrand sodding is about half done and the drainage work has started. Here's a view of the 9th green, sod in place:
Sodding is also complete on #7
A significant improvement to #7 is the drainage work to the front left of the green - now under sod, the enlarged bunkers, and the disappearance of the hedge along the marsh bank.
The bunkers on the right of the 18th green:
and the crew placing the half acre of sod.
A special piece of equipment is pruning tree roots along every tree line on the course. It slices 4 parallel grooves about 10" deep and cuts through roots several inches thick.
French drains are going into the most troublesome areas. Here's an initial trench around the 16th green.
A finished drain on 16 prior to sodding. The drains are finally filled with green mix so their outline won't be visible after grow-in.
Heavy downpours are a problem that create extra work. Two nights ago 1" of rain fell in a short time and part of the new bank on #3 slid into the hazard.
The damage was repaired the next day. Once the sod knits firmly into the bank and drainage is installed in the fairway, there shouldn't be any further problems.