Mark:
The entire project for the golf course has been budgeted in the 3 million range, with about 1.5 for the irrigation, and another 1.5 for the bunkers, tees, tree removal,etc..etc... Then there was an additional 750,00 for some club house renovations.
The renovation/ restoration includes rebuiding every bunker, replacing many lost bunkers, rebuilding every tee, recapturing several acres of fairway,expanding the greens to there original sizes, and cutting down a large number of trees.
The membership was brought up to speed over two years. Including a Donald Ross day that included a lecture from Brad Klein. Placemates in the mens grill with the original routing, informational meetings presented to the membership on the proposed work, and then a vote on the project last fall that past by a 2/3rds majority. Also, the project was presented as a maintenance project. Many of the tees we use today, were the original tees built in the 20's. Things need to be fixed.
I think the most important part of the project, which began today by the way, is that fact that we are getting it all done at once. Granted there is a little bit of redesign, a few new bunkers, but no changes to the greens or the original routing. I would say it is about 95% renovation when you consider everything.