Don,
Count me in the multiple trunk line group. My only caveat, from experience, is that as long as the exit points are on the naturally low side of the green, the cost doesn't go up much. On those few occaisions where we try to drain the green into the hillside, and not down it, then the amount of pipe running around the high side of the green adds up quickly.
The biggest reason we use multiple exits is that I have seen contractors set the trencher at 2 foot depth, and trench away, following any contour in their way, including the ridges, which just doesn't work out well, since pipe must continually go downhill for drainage.....