Bart.....I know Davis and Mark are both disappointed with the delay, because it really is an exceptional site that they have put much time and effort into.
Me....I'm in a state of Cabo withdrawal. I had made 20 trips last year alone by Sept when the plug was pulled because the lender failed.
We were 24 months into construction, twice as long as it should have taken......primarily because of the slowness and lack of equipment and personnel that was being supplied by the General Contractor.
This WHOLE course was formed by a single shaper, Kevin Lippert, a Canadian [which I don't hold against him...much], using only a D5 or 6 bulldozer at different times........we never used [or where able to use] an excavator, off road truck, back hoe, loader, tractor....you get the picture, and I think its remarkable what we were able to do given the limitations.
We were all grassed when things stopped. We were just at the point when the promised track hoe was to arrive so we could begin edge treatment and bunker detailing. We over grassed so we could tear things up a bit at the end.....something I can not wait to do. It will really make it complete and a major difference from what many of the holes look like now.
The photos john selected are some of the ones that need the least finish work.
Anyway......I understand I might be going back again mid March in advance of a start up, and I'm ready.