Martis Camp, Truckee, Lake Tahoe, CA
I'll steal Pats line because I was able to play this new course during opening weekend. This course was carved out of rock and trees on very hilly terrain.
Some of the construction highlights,
The Fazio team used Wadsworth Construction and a really brilliant superintendent who came from Lahontian Golf Club which is located next door.
1) all the fir and pine trees were harvested and sent to market. 2) All other wood including the stumps were ground up on site and trucked to a co generation plant. I’m told it was 6 trucks per hour, all day for over a month. The club lost money on this but they felt it was the right thing to do. 3) The entire golf course was sand capped. (the natural ground is basically rock). 4) Sub air systems were installed in all the greens which the super hopes to raise the temperature in the spring in order to get the greens going after the winter snow. 5) The most amazing drainage system was installed using a series of water collection ponds which then pumps the water back for irrigation. 6) Lastly, the most incredible shaping which showed NO collection areas and not one single drain was visible on the golf course.
They moved 250,000 tons of dirt which they considered small and honestly the course looks like it has been laying there the entire time.
A few photos,
The par 4 18th hole
The par 4 9th.
2nd shot into the par 4 2nd hole